Key points for special equipment factory inspection

Key points for special equipment factory inspection

Key points for factory inspection of special equipment What are special equipment? Special equipment refers to boilers, pressure vessels (including gas cylinders, the same below), pressure pipelines, elevators, lifting machinery, passenger ropeways, and large amusement facilities that involve life safety and are more dangerous. Among them, boilers, pressure vessels (including gas cylinders), and pressure pipelines are pressure-bearing special equipment; elevators, lifting machinery, passenger ropeways, and large amusement facilities are electromechanical special equipment Five key points:
1. "Installation Supervision Inspection Report" and "Special Equipment Registration Certificate" for newly installed boilers and pressure vessels
a. It is not necessary to check the hydraulic test report or pressure test report for the time being. b. For boilers, it is necessary to check the special operation personnel certificate. c. For pressure vessels, it is not necessary to check the special operation personnel certificate. 2. For boilers in use, "Registration Certificate for Special Equipment Use", "External Inspection Report", "Internal Inspection Report", and the corresponding safety valve and pressure gauge inspection or calibration records; (Note the next inspection date mentioned in the report.) For pressure vessels in use, "Registration Certificate for Special Equipment Use", "Pressure Vessel Comprehensive Inspection Report", and the corresponding safety valve and pressure gauge inspection or calibration records (Note the next inspection date or validity period mentioned in the report.)
3. If the factory's boilers and pressure vessels have been scrapped, if the auditor cannot determine whether the boilers and pressure vessels are no longer or cannot be used, the auditor must check the record of discontinuation of use (or receipt). If the factory cannot provide it, please check with the above points 1 and 2.
4. For small and normal pressure hot water boilers, only the boiler registration certificate shall be checked. 5. For simple pressure vessels, the registration and inspection records do not need to be checked.

<<:  APPLE Factory Inspection Code of Conduct

>>:  Polyvinyl chloride MSDS Material Safety Data Sheet

Recommend

Ann Taylor factory audit project

Ann Taylor factory audit project 1. Child Labor CL...

Interpretation of ISCC Audit Key Points

Interpretation of audit points 1. Remote audit an...

BSC factory inspection regulations on working hours

The BSC factory inspection regulations on working ...

2016 WRAP Certification Latest Guidelines

WRAP is reviewing its social responsibility certi...

Poccupine — Borderless Payment Gateway

What is Poccupine? Poccupine is an international ...

Frequently asked questions in Sedex factory audit

The factory inspection market has developed rapid...

ISO9000 family system certification standards

What are the ISO9000 family of system certificati...

bKash--Financial services from Bangladesh

bKash is a mobile financial services company in B...

What is SVCOC Sustainable Viscose Certification?

Viscose (rayon) is a man-made cellulose fiber. Th...

COC Certification: Records Required by Auditors

COC Certification: Records Required by Auditors Re...

BSCI Ten Codes of Conduct

1. Laws and regulations: The company strictly fol...

What is Sellics? What are the functions of Sellics?

What is Sellics? Sellics is an Amazon operation t...