Key points for factory inspection of special equipment What are special equipment? Special equipment refers to boilers, pressure vessels (including gas cylinders, the same below), pressure pipelines, elevators, lifting machinery, passenger ropeways, and large amusement facilities that involve life safety and are more dangerous. Among them, boilers, pressure vessels (including gas cylinders), and pressure pipelines are pressure-bearing special equipment; elevators, lifting machinery, passenger ropeways, and large amusement facilities are electromechanical special equipment Five key points:
1. "Installation Supervision Inspection Report" and "Special Equipment Registration Certificate" for newly installed boilers and pressure vessels
a. It is not necessary to check the hydraulic test report or pressure test report for the time being. b. For boilers, it is necessary to check the special operation personnel certificate. c. For pressure vessels, it is not necessary to check the special operation personnel certificate. 2. For boilers in use, "Registration Certificate for Special Equipment Use", "External Inspection Report", "Internal Inspection Report", and the corresponding safety valve and pressure gauge inspection or calibration records; (Note the next inspection date mentioned in the report.) For pressure vessels in use, "Registration Certificate for Special Equipment Use", "Pressure Vessel Comprehensive Inspection Report", and the corresponding safety valve and pressure gauge inspection or calibration records (Note the next inspection date or validity period mentioned in the report.)
3. If the factory's boilers and pressure vessels have been scrapped, if the auditor cannot determine whether the boilers and pressure vessels are no longer or cannot be used, the auditor must check the record of discontinuation of use (or receipt). If the factory cannot provide it, please check with the above points 1 and 2.
4. For small and normal pressure hot water boilers, only the boiler registration certificate shall be checked. 5. For simple pressure vessels, the registration and inspection records do not need to be checked.

<<:  APPLE Factory Inspection Code of Conduct

>>:  Polyvinyl chloride MSDS Material Safety Data Sheet

Recommend

Introduction to GOTS organic cotton certification agency

GOTS Global Organic Textile Certification Standar...

The correct way to sell products on eBay’s US official website!

eBay US is a huge consumer market. What should yo...

HiggFEM has been revamped! What are the changes?

HiggIndex is a learning tool for small and large ...

WAL-MART factory inspection rectification report issues

Question 1: According to factory regulations, the...

Basic requirements of ISO9000 system certification family

Product quality is the key to the survival of an ...

Purpose of FSC forest certification audit

What is the purpose of FSC forest certification a...

Internal corporate social responsibility audit procedures

2.0 Scope: This document applies to all operations...

What are the benefits of Amazon’s Climate Pledge Friendly program for sellers?

1. The seller’s products will be discovered and p...

What are eBay's payment methods?

For cross-border e-commerce sellers, choosing a c...

WCA factory inspection introduction and content

WCA stands for Workplace Conditions Assessment. W...

What is Dick Smith? What are the advantages of Dick Smith?

What is Dick Smith? Founded in 1968, Dick Smith i...

Oeko-Tex Standard 100 Certification Inspection Standards

Oeko-Tex Standard 100 certification test standard...

Costco announces conditional acceptance of SEDEX factory audit reports

Following Walmart’s announcement of a change in i...