TESCO factory audit-SGS factory audit checklist
Quality management system part (quality department/production and manufacturing department/purchasing/design) Factory OverviewBusiness License/Factory Floor Plan/Organization Chart (Quality Control)/Production Process Flow Chart (Quality Control)Equipment List/Equipment Repair and Maintenance RecordsCustomer Concerns-Development and Design Process/Development and Design Complete Cases (1~3)/Design Changes - Potential hazard risk assessment (physical abnormalities such as metal, glass, etc./chemical/microbiological hazards) -Customer order: specification and quality requirements/customer signature -Customer satisfaction survey/customer complaint handling, product emergency accident handling procedures (including recall procedures) Design department, sales, quality assurance suppliers – supplier list (main raw materials, incoming materials and packaging, etc./one or two factory names for each -Supplier review records/qualified supplier statistics/supplier incoming material status statistics -Orders/specifications/quality requirements issued to suppliers/approvals Purchasing department quality management system – ISO9000 quality management system certificate and the latest internal audit report/external audit report/management review report -Quality manual/procedure documents/document change and receipt records/instrument and equipment internal and external calibration records/QC/QA responsibilities/employee quality training records -HACCP hazard analysis procedures and records (product risk assessment and control) -Defective control/correction/prevention/continuous improvement -UL/CE/EMC/related product test reports/other corresponding safety certificates Quality assurance incoming material inspection - Quality assurance certificate/test report for products exempted from inspection in incoming materials - Various incoming material inspection standards and defect classification/IOC incoming material inspection report/defective product return and concession acceptance record incoming material warehouse IQC Manufacturing process and inspection-first article inspection record/IPQC inspection standard/inspection and defective product handling record -Assembly line tool and sharp tool (blade, broken needle, etc.) receiving and sending control records/metal detection records production line final inspection, packaging/storage -FQC/OQC inspection standards and records/defective product handling records - Records of receiving and sending of sharp tools (blades, broken needles, etc.) in the packaging section/metal detection records -Traceability: shipment tracking statistics/batch identification/date marking packaging section FQC finished product warehouse social responsibility section (administrative personnel department/finance department) Employment conditions-factory rules and regulations/recruitment regulations and procedures/dormitory regulations/security regulations -Employee roster/factory registration/contract -Employee physical examination records/leave records/resignation records/violation handling records -Salary attendance sheet (12 months)/salary sheet (12 months)/various insurance delivery certificates and insured personnel list/various welfare records (paid leave, marriage and maternity leave records) Fire/safety/sanitation/environmental protection – building fire permit/sanitation permit/environmental assessment and permit/fire safety and sanitation policy/environmental protection policy and implementation record/fire safety and sanitation training record/fire drill record/work-related injury medication record TESCO factory audit-SGS factory audit checklist |